English
INDUSTRY SOLUTION
MANUFACTURING
Reliable material flow between production lines, storage and dispatch.
REQUEST A QUOTE →OPERATION FIRST
CONFIGURED AROUND REAL WORKING CONDITIONS.
We confirm floor conditions, load center, aisle width, lift height, shift duration, charging access and local documentation before production.
LOAD REVIEWBATTERY MATCHINGMAST OPTIONS

FROM REQUIREMENT TO DELIVERY
01Working-condition review
02Model and capacity selection
03Battery, mast and attachment confirmation
04Production and pre-delivery inspection
RECOMMENDED RANGE
COMPARE THE ELECTRIC MODELS.
FAST BUSINESS RESPONSE
NEED A CONFIGURATION
FOR YOUR MARKET?
Tell us the load, lift height, quantity and working conditions. We reply within one business day.
CPD-15
CPD-20
CPD-30